Manufacturing

1. Production Lifecycle and Flow

The complete production lifecycle follows a strict sequence, beginning with demand and concluding with reconciliation and destruction:

  • Order Management
  • Supply Chain (Material Receipt/Inspection) → Work Order
  • OS Loading (Operating System)
  • Glue Tape Lamination
  • Milling
  • Embedding
  • Punching
  • Personalization (Perso)
  • Reconciliation (and if needed, Destruction)
  • Final QC
  • Final Packing
  • FGWH (Finished Goods Warehouse) / Dispatch
Feature Benefit
2. Planning and System Controls (PPC & Supply Chain)
  1. Integrated Systems: The planning process is managed through CMS (Card Management System) and SAP (Material Requirement Planning software).
  2. Production Orders: PPC (Production Planning & Control) runs Material Resource Planning (MRP), creates a Bill of Material (BOM), and raises Production Orders based on customer requirements and inventory.
  3. Inventory Security: Raw material and devices are compiled at the Raw Goods Warehouse (RGWH) under the auditable Four-Eyes Principle (4EP) and verified by a QC representative before being issued to production.
  4. Sterilization Protocol: The production area and machines are subjected to a sterilization process by the Production Manager after one production order is complete and before starting a new one. New production only starts after the previous Sales Order (SO) has been closed and machines are sanitized.
3. Asset and Security Controls
  1. Locked Transport & Storage: Material is transported to the production floor in locked trolleys, each carrying a visible adhesive pocket containing the production order and reconciliation sheet.
  2. WIP Security & Key Management: Locked trolleys are used for temporary storage of Work-in-Process (WIP) or uncontrolled assets such as card bodies for trials.
  3. Combination Locks: Production, QC, and Warehouse personnel use combination locks for securing their WIP. Lock codes are changed quarterly, with the Senior Manager PPC serving as the custodian of the codes record.
4. Quality Control and Validation
  1. Pre-Production Trials: For core processes (OS Loading, Glue Tape Lamination, Milling, Embedding, Punching), a small test batch or trial run is conducted first. This batch must be checked, tested, and mutually approved by Production, IT, and QC before bulk production begins.
  2. Final Quality Check (QC): QC is performed on the accepted cards according to the Approved Quality Plan.
  3. Final Count and Packing (4EP): The final count of cards, carton packing, and shrink-wrapping are completed under auditable 4EP (Four-Eyes Principle), involving two authorized personnel.
5. Rejection and Destruction
  1. Quarantine Process: A lockable quarantine cabinet is maintained in the final QC area to isolate rejected Class-1 assets until re-makes are created and replaced. The QC Engineer acts as the custodian.
  2. Reconciliation & Destruction: Reconciliation is performed after personalization. Final destruction of rejected assets follows the approved Rejection Control and Destruction Process.
6. Receiving and Storage of Finished Goods
  1. Designated Area: A specific area inside the Finished Goods Warehouse (FGWH) is allocated for storing finished goods.
  2. Verification: Upon receipt from production, carton labels (from the QC tool and SAP) are checked against the delivery documents (packing list or production report).
  3. Physical Inspection: The physical condition of the received goods is inspected for damage or discrepancies, and findings are documented.
  4. Floor to Listing Methodology: The warehouse team scans the cartons, and data is automatically populated as a Goods Dispatch Note (GDN) in CMS.
  5. Inventory Accuracy: SAP inventory records are matched against received quantities before allocating storage locations.
7. Order Picking and Packing
  1. Prioritization: Customer orders are prioritized based on urgency and delivery deadlines.
  2. Verification: The required quantity is picked from designated storage locations and checked against the order details.
  3. Secure Packing: Items are packed securely to ensure safe transit and prevent damage.
8. Dispatch and Security
  1. Document Generation: All required shipping documents—including GDN and Delivery Challan (DC)—are generated from CMS and SAP.
  2. Security for Transit: Finished goods are transported in a van accompanied by a security guard.
  3. Simultaneous File Delivery: The output file must be delivered along with the goods. Logistics coordinates with the SPDM team to ensure timely delivery.
  4. Proof of Delivery: The customer signs both the GDN and the Delivery Challan upon receiving the goods.
  5. Sales Order Closure: The finance department issues the invoice after customer receipt is confirmed, officially closing the Sales Order (SO).
  6. Communication: An official email is sent confirming the delivery schedule, and all delivery details are updated in the CMS.